Upcoming Road Work for Mid-Missouri May 25 - June 3

The following is a listing of general highway maintenance and construction work in the mid-Missouri area for May 25 - June 3. Weather conditions may cause postponements in the work schedule. Other construction or maintenance work may occur on other roadways throughout the area. Many projects will include lane closures and delays can be expected.

MoDOT reminds the public to buckle up, slow down, follow posted signing and drive safely through work areas. For more information about a project, please contact MoDOT at 1-888-ASK-MoDOT (275-6636) or log onto www.modot.org/central. You can also follow MoDOT's Central District on

Twitter, at https://twitter.com/MoDOT_Central.

All Counties

Daylight Hours

Mowing of right of way is underway in various locations. Motorists should

travel with care and be alert to slow moving equipment along the roadside.

Benton County

Daylight Hours

Route 65 from south of Route 52 to just north of the Osage River in Warsaw

- Widening highway to four lanes continues. The contractor continues

working on grading, culverts and pipe work, and roadway construction.

Traffic on existing Route 65 is not affected.

The project is scheduled to be complete in summer 2012.

Route P between Route 65 and Route E - Partial surface overlay continues

through Friday, May 27. One lane will be open and crews will flag traffic

through the work area.

Boone County

Daylight Hours

Interstate 70 between the Missouri River Bridge and Route BB - Concrete

barriers are in place on the eastbound shoulder. Crews are working in the

shoulder area to excavate and repair a portion of roadside fill to prevent

the soil from sliding and damaging the pavement. Both eastbound lanes are

open to traffic during the work. The ramp to Route BB is narrowed. The work

continues through late July.

Daylight/Overnight Hours

Interstate 70 Northeast Outer Road bridge over Little Cedar Creek, one mile

east of Route Z - Bridge replacement continues. The bridge is closed to

traffic until early June. Motorists should seek alternate routes around

the work. This is part of the Safe & Sound Bridge Improvement Program.

Callaway County

Daylight Hours

Interstate 70 at mile marker 161 - Concrete replacement on the eastbound

and westbound off ramps will take place on Thursday, June 1. The ramps

from I-70 will be narrowed through the work area.

Interstate 70 at mile marker 159 - Roadway paving in the westbound lanes

will take place on Thursday, May 26. One westbound lane will be open

through the work area.

Route Z between Interstate 70 and City of Fulton - Partial surface overlay

continues through Friday, May 27. One lane will be open and crews will

flag traffic through the work area.

Daylight/Overnight Hours

Route 63 bridge over Cedar Creek, 1.5 miles south of the Boone/Callaway

County line -Bridge deck replacement and upgrading guard rail in the

northbound lanes.

  • The northbound bridge is closed to traffic until late May. During

this time, northbound traffic is redirected onto one southbound lane for

approximately ? mile.

  • Bridge painting will take place after the bridge reopens, but some

lane closures may still be needed to finish that work.

This project is part of the Safe & Sound Bridge Improvement Program.

Camden County

Daylight Hours

Route 54 in Linn Creek at the intersections of Route V and Business Park

Road/East Valley Drive - Median turn lane construction and intersection

improvements. Grading and asphalt work continues for the new Business Park

Road and East Valley Drive widening.

  • Traffic is reduced to one lane in each direction, Monday through

Friday until the project is complete. Motorists should expect delays.

This project is scheduled for completion in late spring 2011.

Route J bridge over the Little Niangua River, approximately six miles north

of Route 54 - Bridge maintenance and repair will take place Tuesday, May 24

and continue through mid-June. The bridge will be closed to traffic during

the work. Motorists should seek an alternate route.

Daylight/Overnight Hours

Route 54 between the Grand Glaize Bridge to west of Route KK in Osage Beach

- Grading, drainage work, paving and bridges for the new Route 54

Expressway.

  • Traffic on Laguna Beach Road is routed on the service road where they

will access the new Case Road Interchange.

  • Grading continues from Laguna Beach Road to the Grand Glaize Bridge.

  • The contractor is placing rock base on the new Route 54 Expressway

from Route KK to the west end of the project.

  • The contractor is building the tie-ins to the new Route KK and plans

to switch traffic over to the new Route KK the week of May 16.

  • Key Largo Road traffic has moved to their new location west of where

they currently access existing Route 54.

This portion of the project is scheduled for completion in summer 2011.

Route W bridge over Watson Creek, approximately 3.5 miles west of Route 54

- Bridge replacement continues. The bridge is located 3.5 miles west of

U.S. 54. The bridge is closed to traffic through late May. Motorists

should seek alternate routes around the work area. This project is part of

the Safe & Sound Bridge Improvement Program.

Camden and Miller Counties

Daylight Hours

Route 242/Horseshoe Bend Parkway between Lake Ozark Community Bridge and

Route 54 - Grading and paving for a new four-lane highway.

  • The contractor is excavating and placing material on the western end

of the project near the Lake of the Ozarks Community Bridge.

  • Drainage pipe is being placed near the west end of the project and

construction is underway on a box culvert farther east in the work area.

No traffic delays are expected at this time.

This project is scheduled for completion in late winter 2011.

Cole and Miller Counties

Daylight Hours

Route AA between Route C and Route 54 - Roadway resurfacing continues

through Friday, June 3. One lane will be open and crews will flag traffic

through the work area.

Cooper County

Daylight Hours

Route 5 bridge over Interstate 70 in Boonville - Concrete replacement

continues through Friday, June 3. One lane will be open and crews will

flag traffic through the work area.

Gasconade County

Daylight Hours

Route 100 between Route 19 and Route N - Partial surface overlay continues

through Friday, June 3. One lane will be open and crews will flag traffic

through the work area.

Maries County

Daylight Hours

Route JJ between Route 63 and County Road 634 - Partial surface overlay

continues through Thursday, May 26. One lane will be open and crews will

flag traffic through the work area.

Route P between Route 133 and Route T - Partial surface overlay will take

place on Tuesday, May 31 through Thursday, June 2. One lane will be open

and crews will flag traffic through the work area.

Miller County

Daylight Hours

Route 54 from Business Route 54 in Eldon to the Cole County line - Roadway

resurfacing in the eastbound lanes continues. One eastbound lane will be

open through the work area. This project will continue through mid-June.

Moniteau County

Daylight Hours

Route D between Route 87 and Route U - Partial surface overlay will take

place Tuesday, May 31 through Friday, June 3. One lane will be open and

crews will flag traffic through the work area.

Morgan County

Daylight Hours

Route JJ between Route 135 and Route D - Partial surface overlay and repair

continues through Wednesday, June 1. One lane will be open and crews will

flag traffic through the work area.

Osage County

Daylight Hours

Route 133 between Route 63 and Route P - Partial surface overlay will take

place Tuesday, May 31 through Thursday, June 2. One lane will be open and

crews will flag traffic through the work area.

Pettis County

Daylight Hours

Route 65 between Route B in Sedalia and Route 52 at the Benton County line

- Roadway paving in the northbound lanes continues through Thursday, May

  1. One northbound lane will be open to traffic and crews will flag

traffic through the work area.

Overnight Hours

Route 65 between Route B and Route F - Roadway resurfacing is scheduled to

begin in the northbound and southbound lanes continue through fall 2011.

One lane in each direction will be open through the work area.

Daylight/Overnight Hours

Route HH bridge over Cedar Creek, four miles east of Route 65 - Bridge

replacement continues. The bridge is closed to traffic until mid-June.

Motorists are being detoured around the work area on U.S. 65, Route 50 and

Route O. This project is part of the Safe & Sound Bridge Improvement

Program.

Pettis, Morgan and Moniteau Counties

Daylight Hours

Route 50 from east of Sedalia city limits to Tipton city limits - Roadway

resurfacing continues in driving lanes and shoulders through early fall of

  1. One lane will be open and crews will flag traffic through the work

area.

MoDOT encourages motorists to log onto www.modot.org/central to comment on